Fiber, Transport & Optical

PON (GPON/XGS‑PON), metro/core DWDM, backhaul, and subsea cables.

  • 4 Tracked terms
  • Last 30 days Feed window

What this topic collects on

An article joins this feed when it matches these terms. Each one is also a search of its own.

Latest in Fiber, Transport & Optical

Google News
communicationstoday.co.in > telecom-egypt-psl-sign-deal-for-red-sea-med-subsea-cable

Telecom Egypt, PSL sign deal for Red Sea-Med subsea cable

4+ day, 17+ hour ago   (614+ words) Telecom Egypt and Greece-based subsea cable operator Power Sub Link SA (PSL) have signed an agreement to develop the Sharm El-Sheikh-Taba subsea cable. The project will create the final link connecting the Red Sea and the Mediterranean via the Internet…...

Google News
w.media > telecom-egypt-and-power-sub-link-agree-to-build-sharm-el-sheikh-taba-subsea-cable

Telecom Egypt and Power Sub Link agree to build Sharm El Sheikh-Taba subsea cable – w.media

5+ day, 17+ hour ago   (231+ words) Telecom Egypt, one of the largest subsea cable operators in North Africa, has signed an agreement with Power Sub Link to construct the Sharm El Sheikh-Taba subsea cable, extending the Red Sea Subsea Festoon Cable System to Taba. A press…...

Connecting Africa
connectingafrica.com > connectivity > telecom-egypt-psl-to-develop-sharm-el-sheikh-taba-subsea-cable

Telecom Egypt, PSL to develop Sharm El-Sheikh-Taba subsea cable

5+ day, 16+ hour ago   (781+ words) Telecom Egypt and Power Sub Link have partnered to develop the Sharm El-Sheikh-Taba subsea cable, completing a Red Sea-Mediterranean connection through the Internet Corridor of Egypt. Telecom Egypt and Greece-based subsea cable operator Power Sub Link SA (PSL) have signed…...

The Pointer
thepointer.com > article > 2026-08-24 > huge-gaps-in-doug-ford-s-data-centre-plan-advocates-say-tech-companies-could-pay-higher-electricity-rate

‘Huge gaps’ in Doug Ford’s data centre plan, advocates say. Tech companies could pay higher electricity rate

2+ week, 5+ day ago   (1663+ words) “People have to learn a lot more about data centres,” Ontario Premier Doug Ford said in the same breath as he critiqued municipalities that have bought more time to study the technology’s impact on the environment, energy use and human…...

CBC
cbc.ca > news > canada > hamilton > ontario-data-centre-playbook-hamilton-burlington-9.7307748

Ontario data centre plan needs more transparency, say Hamilton, Burlington councillors | CBC News

3+ week, 6+ day ago   (874+ words) Ontario's new plan to attract data centres needs more transparency for residents, say some elected officials in Hamilton and Burlington. Premier Doug Ford unveiled a new data centre framework last week, saying it will attract investment and create jobs, while…...

@thehubcanada
thehub.ca > 08/14/2026 > ontario-unveils-data-centre-playbook-with-higher-power-rates-and-no-cash-incentives

Ontario unveils data-centre playbook with higher power rates and no cash incentives

4+ week, 1+ day ago   (221+ words) Ontario Premier Doug Ford and Prime Minister Mark Carney tour a construction site in Toronto. Arlyn McAdorey/The Canadian Press. “Any data centre investment will need to invest significantly in local communities and pay more for electricity so no energy…...